The dorms area also needed an entryway near the front door steps so this came next. Here’s a photo of the area after the dirt was dug out:
Next a simple cinder-block retaining wall was built around the deck footings and landscaping fabric was added to keep away weeds from this area:
Then we added gravel to allow water to drain through and put in some scrap polycarbonate under the steps to keep this area dry:
Next came the pavers and pressure treated wood. I also used a little mortar to bridge the gap between the upper and lower levels smoothly:
And finally, the same fabric was added as a top layer:
Here’s a photo of the completed entryway. I felt very happy with how it turned out: